high-strength Plastic formwork manufacturers Special building template for highway and railway

                            high-strength Plastic formwork manufacturers Special building template for highway and railway

                            high-strength Plastic formwork manufacturers Special building template for highway and railway

                            high-strength Plastic formwork manufacturers Special building template for highway and railway

                            high-strength Plastic formwork manufacturers Special building template for highway and railway

high-strength Plastic formwork manufacturers Special building template for highway and railway

high-strength Plastic formwork manufacturers Special building template for highway and railway,Construction & Real Estate,Landscaping Stone
INQUIRY PRECISE INQUIRY
Description

Overview
Quick Details
Place of Origin:
Henan, China
Brand Name:
HTX
Model Number:
HTX-M-001
Shaping Mode:
Plastic Injection Mould
Product Material:
Plastic
Product:
Household Product
Product Name:
Plastic formwork manufacturers
Material:
ABS Plastic
Mould Life:
2-3 Years
Size:
Customized Size
Type:
Special plastic template for highway and railway
Certification:
ISO 9001
Color:
Light Yellow
MOQ:
10pcs
Usage:
Building works
Feature:
High quality, durable and removable

Packaging & Delivery

Selling Units:
Single item
Single package size: 
150x50X7.5 cm
Single gross weight:
20.000 kg
Package Type:
plastic building templates Conventional packaging
Lead Time :
Quantity(Pieces) 1 - 1000 >1000
Est. Time(days) 15 To be negotiated

high-strength Plastic formwork manufacturers Special building template for highway and railway

Product Description

The plastic composite template uses polymer composite materials, which has the characteristics of cold resistance, corrosion resistance, acid and alkali resistance, good toughness, and easy demolding. It is lighter and easier to install than a steel formwork.

 

The formwork is connected by a professional handle, which is easy to disassemble, which greatly saves labor costs and material costs, improves work efficiency, and shortens the construction cycle.

Details

Advantages:

(1) The weight of the formwork is light, and the weight per square (13 ~ 15kg / m2) is much lower than that of large steel formwork (110 ~ 150kg / m2), which reduces the construction risk.

 

(2) Easy installation. The template is connected by 90 ° rotation of the handle for easy installation and disassembly. Operators can get started without professional training.

 

(3) The formwork is smooth and smooth, the joints are tight, and the flatness and smoothness of the surface of the demoulded concrete structure is good.

 

(4) demolding is simple, concrete does not stick to the surface of the board, no demoulding agent is needed, and demoulding is easy.

 

(5) Stable weather resistance, high mechanical strength, no cracking, no deformation, stable size, alkali resistance, corrosion resistance, flame retardant and waterproof under the temperature of -20 ℃ to + 60 ℃.

 

(6) Conducive to maintenance, the template does not absorb water, and does not need special maintenance or storage.

 

(7) Strong variability, the type, shape and specifications can be customized according to the requirements of construction engineering.

 

(8) Reduce the cost, and the turnover can reach 30 ~ 60 times.

 

(9) Energy saving and environmental protection. All leftover materials and waste formwork can be recycled.

Working Process:

(1) A layer of sponge double-sided adhesive is sandwiched between the formwork. The lower part of the formwork is tightly sealed with high-grade cement mortar to prevent slurry leakage.

 

(2) The handles are locked one by one from top to bottom, and cannot be locked from bottom to top to prevent cement slurry from flowing into the hands of the handles, which makes it difficult to remove the handles.

 

(3) After the template is assembled, tap it with a wooden hammer a few times at the seam to flatten it to prevent the template from misaligning.

 

(4) Assemble the template strictly according to the figure, and evenly apply the cement release agent before the template is assembled.

 

(5) The pull holes of the template are reserved. Do not punch holes at will. When pulling, remove the small cap of the reserved hole according to the need. When not in use, use a spare cap to plug the reserved hole to prevent the appearance quality.

 

(6) During the construction process, avoid using sharp objects to remove the mold or rough construction, and ensure the turnover of the formwork.

 

(7) Try not to damage the structure of the formwork during construction, so as not to affect the turnover.

 

(8) When the site conditions permit, immediately after pouring, use a water spray pipe to flush the cement slurry on the ribs on the back of the formwork, which is convenient for later demolishing and maintenance.

Name manufacturers sale House building Plastic templates
SizeCustomized Size
Lifetime800times
MaterialABS Plastic
FeatureHigh quality, durable and removable
MOQ

10pcs/pattern

If have the coner one matched with each patternYes, we have.
Company Information

Henan HTX machinery Co.,Ltd. is a professional company which concentrate on R&D, design, manufacture and wholesale Plastic&Silicone mold products.

 

Nowadays, our mold niche market is Qatar, Oman,,Kenya,Ghana,Chile,Uganda,Thailand, Australia,Saudi ArabiaNigeria,Philippines,UAE,Ethiopia,Palestine,Ecuador,Tanzania, Senegal, Pakistan, Lebanon, Cambodia, Botswana,and so on .

 

We constant insist on the principle : With us your money is safe ,your business if safe. We believe that the quality is our culture and effort to be the leader of led lighting in the world.

Certification

Packaging & Shipping

FAQ

1. Can you make custom designed products?

Yes, we can according to customer requirements, such as shape, size, color, pattern and other details of the product to make.

 

2. How could I know the price of the item?

If you want to know our normal products, you just tell us the item number and your information, I'll give you the best price.

 

If you have individual design requirements, please tell us the following information so that we can offer the price immediately.

 

1) Product model and measurements (you better have drawings, samples or photos).

2) The expected delivery time.

3) Your contact details information.

 

3. What is the MOQ ?

Under normal circumstances, there is no limited to MOQ. It is subject to our esteemed customers. More quantities, the price is more better..

 

4. How could I get the samples?

For the first cooperation,we ask the samples fare + shipping cost, and we will give back the cost after the customer place the order.

For the regular cooperation customers,we offer free sample fare +shipping cost .

 

5. How can I install these building plastic templates?

We will send you the installation procedures including the video or picture for you reference. You can also call our hot line.

Conctact Us